UST Systems Testing
TesTank. Inc. has programs for and is providing UST systems Testing, Inspection, and Compliance Services for the purposes outlined in the Federal regulations cited. State rules will vary, but are unlikely to be less stringent than the federal ones.


UST Systems Testing
TesTank Inc provides Testing, Inspection, and Compliance (TIC) solutions associated with every Phase of your UST’s “Life Cycle”.
PHASE - ANNUAL GENERAL OPERATING LIFE
Annual testing of Pressure Lines.
Annual testing of Line Leak Detectors
Annual testing of the Automatic Tank Gauge
Annual testing of Secondary Containment Sensors
Annual testing of Emergency Shear Valves
Annual testing of Emergency Electrical Shut-Offs
Annual Inspection Facility Walkthrough.
PHASE - 3-YEAR GENERAL OPERATING LIFE
3-year testing of Suction Lines.
3-year testing of Overspill Prevention
3-year testing of Containment Sumps
3-year testing / Inspection of Overfill Prevention.
PHASE - ANNUAL or 3-YEAR GENERAL OPERATING LIFE
· Annual testing State/County oriented Stage I Vapor Recovery
· 3-year testing NESHAP Pressure Decay and Vent Valves
· 3-year testing Bernalillo County, NM Air Quality Program (AQP)
PHASE - As REQUIRED GENERAL OPERATING LIFE
Purposed Toward: Suspected Release, Unusual Operating Conditions investigations (UOC). Replacement, Repair.
Investigation/Testing for Suspected Release, including interstice of double wall tanks, piping, or containment sumps
Investigation/Testing when a 30-day Release Detection method may indicate a release has occurred.
Investigation/Testing - Off-Site ImpactUOC*: Investigation/Testing Erratic dispensing equipment: slow flow.
UOC*: Investigation/Testing Sudden Loss of Product
UOC*: Investigation/Testing Unexplained Presence of Water in Tank.
Replacement of Piping - Testing
Replacement of Piping Secondary - Testing
Replacement of Tank – Testing
Repair of Steel Pipe - Testing (replaced steel pipe sections or fittings)
Repair of FRP or Flex Piping -Testing
Repair of Tank - Testing
Repair of Secondary Containment – Testing
Repair of Overspill – Testing
Repair of Overfill – Testing
PHASE - As REQUESTED UST GENERAL OPERATING LIFE
Helium and/or Nitrogen Troubleshooting/Investigations techniques for Tanks, Product Supply Lines, secondary containment, and Vent systems utilizing Helium and/or Nitrogen pressurization with precision gas detection equipment toward less concrete breaking for repairs.
Assisting your Contractor in troubleshooting Tank Siphon systems or other systems functionality problems
Temporarily Out of Service Tanks - verification of Liquid Levels, Vent system intact, openings secured from accidental use, Impressed Current Cathodic Protection system rectifier indicates ON.
Tank Surveys: Which end of the tank will water accumulate first (tilt)? How high is the STP intake installed off the bottom of the tank? Charting Tank numbering (in ATG vs in state registration vs marked on ground)?
PHASE - CONSTRUCTION
Prior to covering up: Tank/Line, Primary and Secondary Containment
Air Testing of Tanks or Piping
Witnessing and Documentation of Contractors' testing.
Troubleshooting and investigations: with inert gas pressurization.
PHASE - START-UP
3rd Party Testing and Documentation when required for the Installer's final Certification of Installation to a STATE.
3rd Party Testing and Documentation when required for the Installer's final Certification of Installation to an OWNER / OPERATOR.
PHASE - DUE DILIGENCE: PRIOR TO ACQUISTION OR DIVESTITURE There is no Federal and maybe no State requirement to perform. (Buyer or Seller beware).
Now you know that TesTank can help you. Should you have a TIC need that you don’t see covered above, or your compliance team position compels a more in-depth understanding of where these phases and Items of TIC show up. UST Systems Testing
Schedule tightness testing
Systems integrity - verified by technicians who have it.
(817) 294-0112
© 2025 | TesTank | TesTank.Pro | All rights reserved.


President: Dwaine Saltkill
Vice-President: Leticia Saltkill